Guide

Renovation approvals on the Sunshine Coast, and who does what from first drawing to final sign-off.

Most people are unsure what needs approval and who gives it. This guide explains how it works in Queensland for extensions, renovations and structural work, who does what, and what a QBCC licence and contract mean for you. The details depend on the property, and the certifier confirms what applies to yours.

In short

  • Building approval comes from a building certifier, and some work also needs planning approval from council.
  • Whether planning approval is needed depends on the planning scheme and any overlays affecting the property.
  • Structural work needs an engineer's design, and the certifier inspects it at set stages through the build.
  • Check the builder's QBCC licence, insist on a written contract, and know the structural warranty of six years and six months.

Two kinds of approval

Building work in Queensland can need two separate approvals. A building approval checks that the work meets the building rules: structure, wet areas, fire safety, energy efficiency and the like. It is issued by a building certifier, who can be a private certifier engaged for the job. A planning approval checks whether the work fits the council's planning scheme. Here that means Sunshine Coast Council, and whether planning approval is needed depends on the zone, the scale of the work and any overlays on the property.

Overlays map things such as flood risk, bushfire, steep land, heritage and character areas, and the coast. A property under one may need extra assessment or a different design, which is why the block is checked before plans are finalised.

What usually needs approval

Most extensions, second storey additions and structural alterations need a building approval, as do many decks, patios and roofed outdoor structures. A like-for-like kitchen or bathroom refit in the same room often does not, although the plumbing and electrical work in it must still be done by licensed trades and meet their own requirements. Removing or moving a wall, extending a room or changing the structure can change that answer. Some minor work is exempt, but what counts depends on the work and the property, so the certifier checks.

Who does what

An approval involves several people, and it helps to know who is responsible for each part before the job starts. With us, our own certifier handles the building approval and inspections, we work with local designers and engineers, and we bring in a town planner when the block needs one, so you are not left coordinating them yourself.

The people involved

  • Owner: decides what is wanted, briefs the designer and signs the building contract
  • Designer or draftsperson: draws the plans and specifications the builder quotes from
  • Engineer: designs the footings, beams, bracing and any structural change
  • Building certifier: assesses the plans, issues the building approval and inspects the work
  • Council: assesses planning matters where the scheme or an overlay requires it
  • Builder: builds to the approved plans and books the certifier's inspections

Inspections and final sign-off

Approval is not a single stamp at the start. The certifier inspects the work at stages set by the approval, typically the footings, the frame and the finished building, and may ask for engineer's certificates, a waterproofing certificate and other documents along the way. At the end, the certifier issues final documentation confirming the work was completed as approved. Keep it with the house records. Buyers and banks can ask for it, and work done without approval can cause real problems when a house is sold.

What a QBCC licence and contract mean

The Queensland Building and Construction Commission, the QBCC, licenses builders and trades. Domestic building work above a regulated value must be done by a contractor holding the right licence class, under a written contract. You can check any licence on the QBCC online register by name or number. Farmer Constructions holds the Builder Low Rise and Builder Open licence classes under licence number 15195914.

The contract sets out the scope, the price, the allowances, the program and progress payments tied to stages of the work. Ours is a fixed-price QBCC contract, with each prime cost and provisional sum allowance explained before you sign. Read it properly, ask questions, and never start building work on a handshake.

Warranties and home warranty insurance

Licensed residential building work carries statutory warranties. For structural defects, an owner can make a complaint within six years and six months of the work being completed; non-structural defects have a shorter period. QBCC home warranty insurance also applies to eligible residential work, and protects the owner if the work is not completed or defects are not put right, within the terms of the scheme. The builder arranges it as part of the contract and you receive a certificate, so ask for it and keep it.

Where to start

Start with a site visit before plans are drawn. Dani looks at the house, the block and what you want, and flags anything likely to need engineering, planning approval or a town planner. Plans are then prepared by your designer or one of the local designers we work with, our own certifier assesses them and issues the building approval, and the work is priced on a fixed-price contract. Nothing is built until the approval is in place, and the inspections are booked as the job reaches each stage.

Questions

Quick answers.

Do I need council approval to renovate?

It depends on the work and the property. Building approval comes from a building certifier and is needed for most extensions and structural work. Council planning approval is needed only where the planning scheme or an overlay requires it. A like-for-like internal refit often needs neither, but the certifier confirms what applies to your house.

What does a private certifier do?

A private building certifier assesses the plans against the building rules, issues the building approval, inspects the work at set stages and issues the final documentation. In that role they must act independently, even when the builder engages them. We use our own certifier on every job that needs one, so the approval and the inspections are coordinated with the build.

How do I check a builder's licence?

Search the builder's name or licence number on the QBCC online licence register. It shows the licence class, whether the licence is current and any relevant history. Make sure the class covers the work you want done. Farmer Constructions' licence number is 15195914, with the Builder Low Rise and Builder Open classes, and you are welcome to check it before we meet.

What is the statutory warranty on building work?

For structural defects in residential work, an owner can lodge a complaint within six years and six months of completion. Non-structural defects have a shorter period. This sits alongside QBCC home warranty insurance on eligible contracts. Keep the contract, the certificate and the handover documents with the house records so they are easy to find.

Start here

Tell us about the project.

Takes two minutes. If it fits what we do, we call you to arrange a site visit. If it does not, we will say so straight away rather than waste your time.

  1. 01You send the formSuburb, scope and a budget range are enough to start.
  2. 02We call within a business dayA Farmer Constructions team member rings for a short conversation about the house, the block and what you are after.
  3. 03Site visitWe walk it together and talk through the realistic path to a fixed price.
07 5492 9409 Monday to Friday, 7:30am to 3:30pm

Plan my project

A few details and a Farmer Constructions team member calls you back within a business day.

Add your name so we know who to call.
Add a phone number for the call back.
Enter an email address we can reply to.
Which suburb is the house in?
Pick the closest match.
A rough range is fine. It helps us plan the right first conversation. Choose the range closest to your budget.

Sent straight to Farmer Constructions. No newsletters, no sharing your details.

Thanks, it is on its way.

A Farmer Constructions team member will call you within a business day to talk through the project and arrange a site visit.

This one is probably not us.

At that budget a single-trade specialist will usually serve you better and cost less than a licensed builder with a certifier and a fixed-price contract.

If the scope might grow, or you are not sure what it will cost, call and we will talk it through.