In short
- Keeping the sink, cooktop and dishwasher where they are is the biggest single saving in most kitchen renovations.
- Removing a load-bearing wall for an open-plan kitchen needs an engineered beam and a certifier's approval and inspection.
- Joinery is priced on what goes inside the cabinets as much as on the door finish you can see.
- Appliances and benchtops are carried as prime cost allowances, so you choose against a known figure in the contract.
Layout and where the services go
The first question at a kitchen site visit is whether the working layout moves. If the sink, dishwasher and cooktop stay on the same walls, the plumbing, gas and electrical connect where they already are. Putting the sink or cooktop in a new island means running water, waste, gas or power under the floor. On a timber floor that is done from below; on a slab it means cutting a trench and patching it. A rangehood ducted outside adds a path through the ceiling and roof.
A butler's pantry or scullery adds a second set of services and its own joinery, and is often carved out of a laundry or hallway, which brings framing and a wall change with it.
Walls, beams and structure
Most kitchens we build change the room, not just the cabinets. The wall between the kitchen and the living or dining room is the usual one to go. If it carries the roof or a floor above, an engineer designs a beam, our certifier approves and inspects it, and the carpenters install it with the loads propped. The span, whether the beam sits hidden in the ceiling or shows below it, and what sits above it all change the work. The ceiling and floor where the wall stood then have to be made good.
Not every wall comes out cleanly. Plumbing stacks, gas lines, wiring or ducting sometimes run inside it, and moving them becomes part of the job. Dani looks for these at the site visit, because they decide whether the wall goes, moves or stays in part.
Joinery, benchtops and appliances
Cabinetry is made by the local cabinetmakers we work with, measured once the structure is done so it fits the room that exists. The number of cabinets matters, but so does what goes in them. Drawers take more making than doors, and inner drawers, corner fittings, bins and pull-outs all add hardware. Overheads to the ceiling, open shelving, a breakfast bar and panelled appliances change the joinery order too.
Choices that move the price
- Benchtop material and thickness, waterfall ends, joins and the number of cut-outs
- Integrated appliances that need panelled doors and exact cabinet sizes
- A rangehood ducted outside rather than a recirculating unit
- Splashback in tile, stone or glass, and how far it runs
- Cabinet board and door finish, and handles or push-to-open hardware
- Lighting under the overheads, inside the pantry and over the island
- Pantry fit-out, appliance cupboards and charging drawers built into the joinery
Floors, ceilings and the existing house
A new kitchen rarely sits on a floor that is ready for it. The old flooring often stops at the kickboards, so it either runs through to the next room or is patched to meet it, and floor levels can differ once a wall comes out. Older homes can have wiring that is not up to current standards, a switchboard without room for new circuits, or asbestos in old linings. Plumbing under a timber floor may be due for replacement. These are checked at the site visit and carried as provisional sums where they cannot be confirmed in advance.
Timing and living at home
Lead times shape the program. Joinery is made after the structure is finished and the room is measured, and stone benchtops are templated after the cabinets go in, so there are steps that cannot be rushed. You stay in the house, and we help you set up a temporary kitchen with the fridge, a bench and power in another room. Choosing appliances early so they arrive before the fit-off, and avoiding the busiest weeks of your year, keeps the kitchen out of action for as short a time as possible.
When the kitchen is part of a larger renovation or an extension, the same order applies: the room around it is built and finished first, then the joinery goes in once, measured to what is really there.
How the price is fixed
We quote kitchens on a fixed-price QBCC contract. The structure, services, flooring, plastering, painting and installation are priced in full from the plans. Benchtops, appliances, tapware, tiles and some joinery finishes are carried as prime cost allowances, so you can see what an upgrade changes before you commit. Work that depends on what is behind the walls is carried as a provisional sum. Dani walks through each allowance with you before you sign.
Start with a site visit. Bring any plans, sketches or pictures you have, and we will tell you what the room allows and what the changes you want involve.