Guide

What a bathroom renovation costs on the Sunshine Coast, and how to plan one that lasts.

You will not find a price list here. Two bathrooms the same size can differ widely once the layout, the selections and what sits behind the old tiles are known, and only a site visit shows that. This guide explains what moves the number and how to plan a bathroom properly.

In short

  • Keeping the toilet, shower and basin where they are saves plumbing work, while moving them changes the job under the floor.
  • Waterproofing is the part you never see and the part that fails first, so it goes to a licensed waterproofer.
  • A shower niche is far easier to build into a new wall than to cut into an old one later.
  • Hidden water damage, rot and asbestos are carried as a provisional sum, so a discovery already has a line in the contract.

Layout: keep it or change it

The biggest single decision is whether the layout stays. If the shower, toilet, vanity and bath stay roughly where they are, the plumber works with the existing drainage. Moving the toilet, or turning a bath into a walk-in shower on the far wall, means new drainage, and on a slab that can mean cutting the floor. Combining rooms, or borrowing space from a hallway or linen cupboard, adds framing and often a wall change the certifier needs to look at.

Before you decide, spend a few weeks looking at bathrooms you like and write a short list: shower, bath or both, single or double vanity, storage, lighting, and power for hairdryers and heated rails. A clear list makes a clear quote.

What hides behind the old tiles

Most surprises in a bathroom turn up on the first day of demolition. Old showers leak slowly for years, and the floor framing, studs and linings behind them can be soft or rotten. Older homes may have asbestos in wall sheeting or floor underlay, which a licensed removalist must take out. Termite damage stops work until the area is inspected and cleared. Earlier work that was not done properly has to be put right before anything new is built on top of it.

None of this can be priced exactly until the room is stripped, so it sits in the contract as a provisional sum. If extra work is needed, we show you what we found and agree the variation in writing before it goes ahead.

Selections, tiles and fittings

Selections are where you have the most control. Tiles, tapware, vanity, screen, toilet, mirror and lighting are carried as prime cost allowances, and we point you to the local suppliers we use. Tile choice affects labour as well as supply: standard formats lay quickly, herringbone and other patterns take longer, and tiling floor to ceiling uses more tile and more of the tiler's time, though it saves painting. Spend on what is built into the wall, such as mixers and in-wall spouts, because replacing them means opening the tiles. Rails and mirrors are easy to swap later.

Waterproofing, done once and done properly

Waterproofing goes on after the framing, plumbing and sheeting and before the tiler starts. It is built to the Australian standard for wet areas, which sets how far the membrane runs up the walls and across the floor, with more coverage in the shower and on timber or upstairs floors. Ours is applied by a licensed waterproofer, cured for the time the product needs, certified and inspected before any tile goes down. Rushing a cure to save a day is how bathrooms fail, so the program allows for it.

Niches and showers

Almost every bathroom we build has a shower niche, and the time to plan it is before the frame is lined. A niche is formed between the studs, so the stud depth sets how deep it can be; measure your tallest bottles before you choose. Keep it out of the main spray, often on the wall opposite the shower head or opposite the entry, between waist and eye height. Size it to the tile so the cuts land neatly. In a block wall, a niche needs a false wall built out in front.

Shower details worth deciding early

  • In a walk-in shower, put the head and the drain on the side away from the entry
  • Place the mixer so you can turn the water on without standing under it
  • Match the drain grate and screen hardware to the tapware finish
  • Choose a frameless, pivot, fixed panel or open walk-in screen to suit the space
  • Add a rail or hand shower for tall family members and easier cleaning

Living at home through the works

You stay in the house during a bathroom renovation, so plan around it. If there is a second bathroom, we keep it usable throughout. If there is only one, we plan the sequence and any temporary facilities with you so the time without a shower is as short as possible. Avoid school holidays and family events if you can, expect short water and power shutdowns while the plumber and electrician connect, and keep a clear path from the street for materials and rubbish. Order items with long lead times early so the tiler is never waiting.

Getting a real number

A real price for a bathroom comes from a site visit. Dani looks at the room, the floor structure, the plumbing and what he can see under the house or in the ceiling, and talks through your list. We then quote on a fixed-price QBCC contract: the scope priced in full, a prime cost allowance for each selection and a provisional sum for hidden damage, each explained before you sign. Bring a designer's layout if you have one; if not, we can connect you with the local designer we use.

Questions

Quick answers.

Do I need approval to renovate a bathroom?

A like-for-like bathroom in the same room generally does not need council approval. Moving or removing walls, extending the room or changing the structure can, and the plumbing work has its own compliance requirements. Our certifier confirms what applies to your house before work starts and handles the approval if one is needed.

What makes one bathroom more work than another of the same size?

Mostly what changes and what is found. A new layout means new drainage, and a slab may need cutting. Patterned or floor to ceiling tiling adds labour. In-wall mixers, a freestanding bath or a heated rail add work behind the wall. Rot, asbestos or poor earlier work found at demolition adds repairs before the new room goes in.

Is it worth doing the bathroom and laundry together?

Often, yes. Wet areas share plumbing runs, waterproofing and the same tilers, so doing them in one program avoids bringing every trade back twice. It also means one stretch of disruption rather than two. If the rooms sit side by side on the same plumbing, it is usually the most efficient way to do the work.

Should I replace the bath with a walk-in shower?

It depends on who uses the room. Young children are easier to wash in a bath, and many families keep one for that reason. In an ensuite, or a house where the children are older, a generous walk-in shower is often the better use of the space, and swapping a large old bath for one is a change we make often.

Start here

Tell us about the project.

Takes two minutes. If it fits what we do, we call you to arrange a site visit. If it does not, we will say so straight away rather than waste your time.

  1. 01You send the formSuburb, scope and a budget range are enough to start.
  2. 02We call within a business dayA Farmer Constructions team member rings for a short conversation about the house, the block and what you are after.
  3. 03Site visitWe walk it together and talk through the realistic path to a fixed price.
07 5492 9409 Monday to Friday, 7:30am to 3:30pm

Plan my project

A few details and a Farmer Constructions team member calls you back within a business day.

Add your name so we know who to call.
Add a phone number for the call back.
Enter an email address we can reply to.
Which suburb is the house in?
Pick the closest match.
A rough range is fine. It helps us plan the right first conversation. Choose the range closest to your budget.

Sent straight to Farmer Constructions. No newsletters, no sharing your details.

Thanks, it is on its way.

A Farmer Constructions team member will call you within a business day to talk through the project and arrange a site visit.

This one is probably not us.

At that budget a single-trade specialist will usually serve you better and cost less than a licensed builder with a certifier and a fixed-price contract.

If the scope might grow, or you are not sure what it will cost, call and we will talk it through.